What does the FLSA require you to record?
For each worker covered by minimum wage and overtime, 29 CFR 516.2(a) lists twelve items. In plain words:
- Full name as used for Social Security, plus any employee number you use on time or payroll records.
- Home address, with ZIP code.
- Date of birth, if under 19.
- Sex and occupation.
- The time of day and day of the week the workweek begins. One note for the whole company is enough if everyone shares the same workweek.
- The regular hourly rate in any week overtime is due, the basis of pay (hourly, daily, piece, and so on), and any payments excluded from the regular rate.
- Hours worked each workday and total hours worked each workweek.
- Total straight-time earnings for the day or week.
- Total overtime premium pay.
- Additions to and deductions from wages each pay period, with dates, amounts and what they were for.
- Total wages paid each pay period.
- Date of payment and the pay period it covers.
Item 7 is the one a time clock produces, and it is the one most often missing or reconstructed on construction crews. The U.S. Department of Labor puts it simply in Fact Sheet #21: the law requires this information to be accurate.
There is one shortcut. For people on a truly fixed schedule, 516.2(c) lets you record the schedule and mark the weeks it was followed, recording actual hours only when they differ. Construction schedules rarely stay fixed for long, so most contractors record real hours.
How long do you have to keep timekeeping records?
Two retention periods apply, and they are counted from different dates:
- 3 years for payroll records with the data listed above, counted from the last date of entry (29 CFR 516.5). The same section covers certain written agreements and sales and purchase records.
- 2 years for the supplementary records behind the payroll: time cards or sheets with daily start and stop times, and wage rate tables, counted from the last entry or the last effective date (29 CFR 516.6). Customer invoices and billing records also fall here.
Records must be kept safe and accessible at the place of work or at a central office. If they are at a central office, you have 72 hours to make them available after the Wage and Hour Division asks (29 CFR 516.7). For a contractor with several job sites, that usually means the office, not the foreman's truck.
Many companies simply keep everything at least 3 years. Your state, your insurer or a public contract may require longer, so check before you shred.
Does the law require a time clock or a specific form?
No. 29 CFR 516.1(a) says no particular order or form of records is prescribed, and electronic records are allowed as long as they are clear, identifiable by date or pay period, and can be produced on request. 29 CFR 785.48 states that time clocks are not required. The DOL's own wording is that employers may use any timekeeping method they choose, and any plan is acceptable if it is complete and accurate.
That freedom cuts both ways. A paper sheet filled in on Friday from memory meets the "form" requirement but often fails the "accurate" one. If hours are ever disputed and your records are weak, you are arguing from a weak position.
When you do use a clock, 785.48(a) adds a useful point: early or late punches by people who are not working can be disregarded, but large gaps between the clock and the actual hours raise doubt about the whole record. Decide what a punch means (ready to work, on site) and apply it the same way to everyone.
Is rounding punch times allowed?
Yes, within limits. 29 CFR 785.48(b) accepts rounding start and stop times to the nearest 5 minutes, tenth of an hour or quarter hour, provided that over time it does not result in failing to pay people for all the time they actually worked. The practical test:
- Round to the nearest increment, both directions, for everyone. 7:07 becomes 7:00 and 7:08 becomes 7:15 on a quarter-hour rule.
- Do not round only in your favor, for example always rounding clock-in up and clock-out down.
- Do not round away time people are actually working. If the crew is unloading at 6:50, that time counts.
Separately, 785.47 allows ignoring truly uncertain periods of a few seconds or minutes that cannot practically be recorded, but not any part of the regular, required working time. With a clock that records the minute, the simplest policy is to pay the minutes.
Do lunch breaks count as hours worked?
A real meal break does not; a lunch where the worker keeps working does. Under 29 CFR 785.19, a bona fide meal period is not work time if the employee is completely relieved from duty. Ordinarily 30 minutes or more is long enough. A worker who eats while watching a pump or waiting on a delivery is working.
Short rest breaks are different. Breaks of about 5 to 20 minutes are counted as hours worked (785.18). Federal law does not require lunch or coffee breaks at all (DOL, Breaks and Meal Periods), but a number of states do; the DOL keeps a table of state meal period rules.
Many contractors deduct a fixed 30 minutes automatically, because nobody on a crew punches out for lunch. That is workable if the crew really takes the break, and if you have a way to pay the days they did not.
Is travel between job sites paid time?
Yes. 29 CFR 785.38 names it directly: travel from job site to job site during the workday must be counted as hours worked. So does travel from a place the worker is required to report to, such as the shop to pick up tools or get instructions, to the job site.
Ordinary travel from home to the first site and from the last site home is not work time, even when the site changes every week (785.35). The line is drawn at the first place the worker is required to be.
For crews that move during the day, this is where records go wrong: the worker clocks out at one house, drives 25 minutes, and clocks in at the next. Those 25 minutes are paid time. See how to track hours across multiple job sites for ways to handle it.
What about the foreman's reports and work nobody asked for?
The hours belong to the worker, not to the report. Work that is not requested but is "suffered or permitted" is work time (29 CFR 785.11), and management must actually prevent work it does not want done; a rule on paper is not enough (785.13). If a foreman lets the crew start at 6:30 and writes 7:00 on the sheet, you owe the 30 minutes.
Two more points for construction:
- Each workweek stands alone. Overtime is owed for hours over 40 in a workweek, and averaging over two weeks is not allowed (Fact Sheet #23). Hours on different jobs in the same week are added together (778.103).
- Public work has extra paperwork. On federally funded construction covered by Davis-Bacon, contractors submit weekly certified payrolls; form WH-347 is optional, but the information is not (DOL, WH-347).
Do state laws add requirements?
Often, yes. 516.1(c) says the federal rules do not excuse anyone from state or local recordkeeping requirements. States may require meal breaks, daily overtime, pay statements with specific content, or longer retention. Look up your state labor department in the DOL's directory of state labor offices, and if you work in more than one state, check each one.
This article explains the federal rules in plain language. It is not legal advice; for a specific situation, talk to an employment attorney or your state agency. To check a week of hours quickly, try the free timesheet calculator.