What should a construction daily report include?
Each item answers a question someone may ask later:
- Job, date and author. Which job, which day, who wrote it.
- Weather. Conditions and temperature, and whether they stopped or slowed work. Rain days are a common source of schedule disputes.
- Crew on site and hours. Your people and their hours, plus subcontractors and how many workers each had.
- Work performed. What was done, where, specific enough to check: "set ledger and 6 joists on the east side", not "deck work".
- Materials delivered and used. What arrived, from whom, anything short or damaged, and what was installed.
- Equipment. What was on site, rented or owned, and any breakdowns.
- Visitors and inspections. Client, architect, inspector: who came, when, and the result.
- Delays and problems. What held things up and who or what caused it: late delivery, waiting on a decision, a failed inspection, a site you could not access.
- Instructions and changes. Anything the client asked for on site, especially extra work not yet on a change order.
- Safety. Incidents, near misses, and what was done about them.
- Photos. Progress, problems, deliveries, and anything that will be covered up the next day.
Why does a daily report matter?
Because memory does not hold up in a dispute, and a record written the same day does. The daily report is what you reach for when:
- A client disputes a delay. "Waiting on tile selection, client notified" on four consecutive days is a very different conversation from "I think we were waiting on them."
- Extra work needs to be billed. An instruction given on site, recorded the day it was given, supports the change order.
- Something is covered up. Photos of the framing before drywall answer questions about what is inside the wall.
- A claim arrives. Damage to a neighbor's property, an injury, a defect: the report and photos show conditions on that date.
- You bid the next job. Real crew days per task are better estimating data than a guess.
The report is only as strong as its timing. Reports written in a batch at the end of the week read like reconstruction, because they are.
Who writes the daily report, and when?
The person in charge on site, at the end of each workday: the foreman, lead carpenter or superintendent. On a small remodel with the owner on site, it may be the owner.
- One report per job per day. Two crews on the same job should not produce two versions of Tuesday. If both leads contribute, one report holds both.
- Written before leaving the site, or the same evening. Ten minutes on the day beats an hour on Friday.
- Facts, not opinions. "Inspector failed rough plumbing, missing nail plates at kitchen wall" is useful. "Inspector was difficult" is not.
- Not rewritten later. If something was wrong, add a correction with the date. A report that changes after a dispute starts loses its value.
What does a simple daily report template look like?
Copy this list into whatever you use, paper or app. Keep every heading even when the answer is "none": a blank says nothing, "no delays" says something.
- Job / address:
- Date / written by:
- Weather: conditions, temperature, effect on work
- Our crew: names and hours
- Subcontractors: company, number of workers, what they did
- Work performed: task, location, quantity
- Materials delivered: what, supplier, issues
- Equipment on site: rented or owned, problems
- Visitors and inspections: who, time, result
- Delays / problems: what, cause, who was told
- Client instructions / changes:
- Safety: incidents, near misses, actions taken
- Photos attached: how many, of what
- Plan for tomorrow:
How does the daily report relate to OSHA and timesheets?
It supports both, but replaces neither.
- Serious injuries have their own deadlines. Every employer covered by the OSH Act must report a work-related fatality to OSHA within 8 hours, and an in-patient hospitalization, amputation or loss of an eye within 24 hours (29 CFR 1904.39). Writing it in the daily report is not reporting it to OSHA.
- Injury logs depend on company size. If your company had 10 or fewer employees at all times during the last calendar year, you generally do not need to keep OSHA injury and illness records, unless OSHA or BLS tells you in writing; above that, you do (29 CFR 1904.1). See OSHA recordkeeping.
- Hours in the report are not payroll records. The crew hours in a daily report are useful context, but the FLSA record is each person's hours per day and per week (FLSA timekeeping requirements). If the two disagree, you have a problem in both.
How do you get crews to write reports every day?
- Make it short. A template with fixed headings takes minutes. A blank page takes forever.
- Let photos do part of the work. Three photos and two lines often say more than a paragraph.
- Accept the crew's language. A foreman who writes clearly in Spanish or Portuguese writes a better report than one forced into broken English. Translate the important ones if a dispute comes.
- Read them. If the office never responds to a report, the foreman learns that nobody reads it. A weekly reply about a problem flagged in a report keeps them coming.
- Keep them with the job, not in someone's phone gallery or email.